Understanding Fec105 Mar 9 2022
Welcome to our comprehensive guide on Fec105 Mar 9 2022. 815307822 with racks on the head end of the hot train in the rain. EoT past MP236 at 5:59PM.
Key Takeaways about Fec105 Mar 9 2022
- 809301810 running 35mph with forty-six intermodal for 9800 feet at 408 axles. EoT past MP236 at 6:00PM.
- 818304801 with ECH in the second window and fifteen auto racks ahead of the intermodal cars. EoT past MP236 at 7:19PM.
- 812307802 with the hot train. EoT past MP236 at 6:11PM.
- 811303802 with twenty-one racks ahead of the intermodal. EoT past MP236 at 6:31PM.
- 815300822 with a gon and racks ahead of the intermodal. EoT past MP236 at 5:36PM.
Detailed Analysis of Fec105 Mar 9 2022
438 LHF with work gons, hoppers, a ballast car, nine beams, two loads of limerock base and a couple of scrap gons. EoTpast ... 814310816 with racks and intermodal. EoT past MP236 at 6:05PM. 802308806511 with two racks ahead of the IM for 6300 feet on the hot train. EoT past MP236 at 6:25PM.
803309821 with racks and intermodal at 390 axles. EoT past MP236 at 5:59PM.
In summary, understanding Fec105 Mar 9 2022 gives us a better perspective.