Understanding Fec101 Aug 29 2012

Let's dive into the details surrounding Fec101 Aug 29 2012. ECH and Jim on 102, 142 and Heritage714 with all IM. Long train running about 45mph. EoT past MP216 at 6:16PM.

Key Takeaways about Fec101 Aug 29 2012

  • Masked ECH waving from the tread of 106 and 103, 720LHF with racks ahead of the IM. Long train running 45mph or better.
  • Steve bringing 'em past us watching from the Junction on 105, 104 and 708LHF. Lots of IM to watch on this fast-moving train.
  • Swapped and going back, paired 103 and 100 with 431 leading all IM. EoT past MP216 at 7:43PM.
  • BOS AT ANA -
  • TBA AT TEX -

Detailed Analysis of Fec101 Aug 29 2012

ECH and Jim on the 101 tonight engines 102142,and my favorite 714 heritage unit. They were running a little late due to a meet ... ATL AT SDN - Cut-out night for the crew as they head for the meet with FEC202 at Gifford. Steve on 103 and 140, 720LHF with all IM and 2 brand ...

SEA AT MIN -

That wraps up our extensive overview of Fec101 Aug 29 2012.

Fec101 Aug 29 2012.pdf

Size: 8.55 MB · Format: PDF · Secure Download

Download PDF Read Online

Related Documents