  • Working on the line drift to widen it to 2 lanes. Crew is still struggling with equipment and had to switch to the snow cat.
  • Crews recover a large portion of guardrail damaged by an avalanche on the
  • Just above Roller. The crews are using the two snow-gos to
  • Crews are trying to pull guardrail back to the roadway. An avalanche pulled the guardrail from the
  • Widening the area and ditches near the state line.

In-Depth Information on Beartooth Highway Clearing May 5 2014

Just above Knox Point with the snowcat. With the loss of the big blower the crew is using other equipment to Snowcat works on the roadway. Crews have reached Vista Point and work on widening the plowed area. About a quarter mile from Knox Point. The crew has a blower from another section to assist in the

Large blower working on the milepost 46 drifts. The blower and snowcat work together to remove the snow layer by layer.

That wraps up our extensive overview of Beartooth Highway Clearing May 5 2014.

Beartooth Highway Clearing May 5 2014.pdf

Size: 11.43 MB · Format: PDF · Secure Download

Download PDF Read Online

Related Documents